Back to Home
Case StudyMay 21, 20267 min read

Case Study: How a Rubber Manufacturer Saved 18% on Material Costs with Gomaplast Dosing System

A mid-size rubber compounding facility serving automotive and industrial markets replaced their manual weighing process with a Gomaplast GMI semi-automatic batch weighing system. Twelve months later, material waste was down 18%, batch rejections had dropped by 95%, and the system had paid for itself in nine months.

Facility Profile

IndustryRubber compounding — automotive and industrial seals
Annual production volume~5,200 batches per year
Active compound formulations47 recipes
Ingredient range12–18 ingredients per recipe
Annual raw material spend~$520,000
Previous processManual weighing with paper batch records

The Problem: Three Years of Unexplained Quality Variation

The facility had been experiencing a pattern of quality problems that their process engineering team couldn't attribute to a consistent root cause. Batch rejection rate averaged 1.6% — not catastrophic, but generating approximately $34,000 annually in rework and scrap costs at their batch sizes and material prices.

More concerning was the customer complaint pattern: consistent, repeatable production issues in one compound family that periodically produced parts at the low end of hardness specification. Root cause investigations consistently came back to "compound variation" — but with paper batch records and no actual weight data, they couldn't confirm whether it was a weighing issue or a mixing issue.

The operations director commissioned a three-month manual audit: a quality technician spot-checked 15% of batches by weighing ingredients before and after dispensing. The results were illuminating: average over-dosing of accelerator was 3.1%. Sulfur loading varied by ±4.2% from recipe specification. The compound variation causing their customer complaints was almost entirely attributable to manual weighing inconsistency.

"We'd been chasing a mixing problem for three years. It was a weighing problem all along. We just didn't have the data to see it."
— Operations Director

Results at 12 Months Post-Installation

Annual material waste reduction

18%

~$94,000/year on $520K material spend

Batch rejection rate

0.08%

Down from 1.6% with manual weighing

Batches per shift (single operator)

115

Up from 42 with two operators

System payback period

9 months

Faster than pre-purchase projection of 15 months

Audit preparation time

3 hrs/quarter

Down from 2 full days with paper records

Customer quality complaints

−72%

Year-over-year, 12 months post-installation

Implementation Timeline

1
Month 1–2

Specification & Site Survey

Gomaplast technical team conducted a site survey to assess bin storage requirements, carousel footprint, PLC network integration points, and scale positioning. Recipe data was audited against ERP master formulations — seven inconsistencies were found and corrected before system configuration.

2
Month 3–4

Manufacturing & Configuration

The 10-station carousel system was manufactured and configured at the Gomaplast facility. PLC recipe library was loaded with all 47 active compound formulations. ERP integration (SAP MM/PP) was specified and interface mapping completed.

3
Month 5

Installation & Commissioning

Physical installation over a planned 4-day production shutdown. PLC commissioning and ERP interface testing. Operator training — all four production operators plus the quality manager completed Gomaplast's operator certification program.

4
Month 6–7

Parallel Operation

Full parallel operation: the Gomaplast system ran alongside the legacy manual process. All batch records were compared. 100% agreement on weight data after addressing one initial ERP unit-of-measure conversion issue.

5
Month 8

Full Cutover

Manual weighing process retired. ERP integration live — production orders flow from SAP to the dosing station automatically. Batch completion data and actual weights return to SAP in real time.

6
Months 9–20

Operations & Results

The facility tracked all key metrics against the pre-installation baseline. Material waste, rejection rate, throughput, and audit time all improved substantially beyond the pre-purchase projections.

Ready to See Similar Results?

Contact Gomaplast to discuss your production environment and get a system configured for your specific material range and batch volumes.